Mayor Allen Joines, City Of Winston-Salem | Mayor Allen Joines Official Facebook
Mayor Allen Joines, City Of Winston-Salem | Mayor Allen Joines Official Facebook
The installation of new sidewalks and drainpipes under Petree Road will necessitate reducing the road to one lane from Robinhood Road to Shattalon Drive for through traffic in two phases.
The first phase will occur from June 14 to June 21, between 7 a.m. and 5 p.m. The second phase is scheduled from June 24 to August 30, also between 7 a.m. and 5 p.m.
For more information, contact CityLink at CityLink@CityOfWS.org, call (336) 727-8000, or use any of the methods on CityOfWS.org/CityLink. Subscribe to Alert Center and News Flash for updates at CityOfWS.org/NotifyMe.